Work completed at Car Transplants, Nantwich, Cheshire.
This consisted of breaking out the existing concrete to prepare the way for a new concrete yard.
The work area was 19.5 metres by 13.6 metres, 73.5m3 concrete was poured.
The job was complete in 3 days.
Comments